Restore or replace, in dollars

What restoring costs, next to replacing

Restoring a low-slope roof with a coating system typically runs $3.50 to $7 per square foot installed. Tearing it off and replacing it typically runs $10 to $18. Applied over a sound, dry roof, a restoration system adds 10 to 15 years of service life. Run your roof through both ranges below: typical installed figures from published industry sources, not a quote.

The calculator

Run your roof through both ranges

Type the roof area. The four rates are typical installed costs per square foot, and you can overwrite any of them with a figure from your own quote. Then set the years of added service you are planning on.

sq ft

All roof levels, measured flat on plan

$ per sq ft installed

Typical installed rates. With a restoration quote in hand, divide its total by the roof area and type the result in both boxes

$ per sq ft installed
$ per sq ft installed

Tear-off and a new roof. With a replacement quote in hand, divide its total by the roof area and type the result in both boxes

$ per sq ft installed
years

Your own planning figure; it assumes the coating goes over a sound, dry roof

Typical ranges for this roof

Type the roof area and the three ranges appear here.

Typical installed ranges drawn from published industry figures, not a quote or an offer. Your roof's condition, how much wet insulation comes out, access and region move the number. Years of added service are your planning figure and hold only over a sound, dry roof.

Request a moisture scan

Side by side

Two routes, and what the money buys on each

Both end with a roof that keeps water out. What differs is what you pay to take off, what goes to the dumpster, and what the building lives through while the work goes on. The cost row gives typical installed ranges, not a quote.

Restoration

Typical installed cost
Typically runs $3.50 to $7 per sq ft installed
What you pay for
Cleaning, repairs, primer where the substrate calls for it, detail work at seams and penetrations, then the coats: base and finish for an acrylic, silicone alone
The old roof
Stays in place as the base for the new surface, once any sections found wet are cut out and replaced
The building during the work
Stays open and in use while the coating goes on
Wet insulation
Found first with a survey and cores; only the wet areas are cut out and replaced, before any coating goes on

Tear-off and replacement

Typical installed cost
Typically runs $10 to $18 per sq ft installed
What you pay for
Removal and disposal of the old roof, new insulation, a new membrane and new flashings
The old roof
Comes off, every layer, down to the deck
The building during the work
Has sections opened to the deck while the old roof comes off and is hauled away
Wet insulation
Comes off with the rest of the roof, wet or dry, and every square foot of new insulation is in the price

Is this roof a candidate?

Low end or high end

What moves a restoration inside its range

Where a roof lands between the low and the high end depends on seven things. Four are found on the roof, two are settled in the specification, and one is where the building is. Ask about each before anyone prices the job.

Wet insulation coming out Cutting out and replacing wet areas is part of the installed price and grows with the square feet that come out. If so much is wet that replacing makes more sense, the comparison turns over.
Details per square Curbs, pitch pans, drains, pipes and seams are detailed by hand with fabric, tape or sealant before the field is coated. A roof crowded with units carries more of that per square.
Surface texture A granulated cap sheet takes more material than a smooth membrane, because the first coat goes into the granules. Ribbed metal and sprayed foam carry more surface than their plan area.
Size, height and access Part of every job is getting the crew, the equipment and the material onto the roof. On a small roof that share weighs more per square foot, and height and awkward access add to it.
Chemistry Acrylic systems sit toward the low end, silicone toward the high end. Where water stands after rain, the roof's drainage usually makes that choice.
Film build The data sheet and the written specification set how much coating goes on each square. A thicker film means more gallons, so ask each contractor which film build their price assumes.
Region Labor rates and travel to the building vary by market. The published ranges are not specific to any one region; a local contractor prices both.

What a restoration involves

What a bid cannot see

Nothing in daylight, warm in thermal

A sample from a real scan, with the address, the people and the companies removed and the map re-oriented. In daylight this patch looks like the rest of the membrane. In thermal it reads warmer than the dry roof around it. A price based on what the eye can see would miss it.

  • Nothing to mark it in daylight

    Daylight view of a patch of membrane roof with nothing visible to mark it; a dotted orange outline shows the area the scan flagged Daylight
    The same patch in thermal, a warm area inside a white dotted outline Thermal
    Area flagged
    34.2 sq ft
    Warmer than around it
    +9.5 °F
    A suspect until a core confirms it.

The sample shows the map and the image pairs; a full scan also comes with video from the flight and a written assessment.

Before the bids

Firm up the number before anyone prices it

Whether the roof is dry is the one part nobody can price from the ground: without a survey, nobody knows how much wet insulation has to come out. On an evening after a sunny day, once the sun has set, we arrange the flight: a drone with a thermal camera flies over the roof. Wet insulation holds the day's heat longer than dry insulation and shows warmer, so you get a map with the areas that look wet outlined and measured in square feet, along with video from the flight and a written assessment, then confirmed with small core samples.

  • Once cores confirm the mapped areas, every contractor can price the same areas, measured in square feet
  • It usually takes one evening, nobody has to walk the whole roof, the building runs as normal, and we fly only with the owner's written go-ahead
  • Ballasted or heavy-gravel, metal panel, highly reflective or already white-coated, and closed-cell foam roofs are surveyed another way, and we say so
  • We arrange scans for commercial low-slope roofs anywhere in the US

Will a scan work on your roof?

Materials and labor

Who supplies what, and who does the work

A restoration can be bought as one installed price, or in two parts: the materials, and the contractor's labor. The ranges above are installed figures and cover both. If you buy the materials yourself, agree that up front with the contractor so nothing is counted twice. If you have no contractor yet, we work with a network of installers, roofing contractors who apply these systems, and can introduce you to one anywhere in the US, who looks at the roof and says whether it is a good candidate for restoration.

  • Materials: genuine Sherwin-Williams Uniflex in sealed packaging, priced per project on a written quote
  • Quotes answered within one business day; in stock by the pail, drum and tote, and stocked items ship in 1–3 business days
  • Installed job: the contractor's, never ours, from cleaning and wet-area repairs to the finish coat
  • Sherwin-Williams offers UNIGUARD system warranties of 10 or 15 years when its authorized contractors apply the system. The warranty is the manufacturer's, under its own terms; we supply the materials

From scan to finished roof

Questions

Questions owners ask about the numbers

What owners and facility managers ask when they set a restoration beside a replacement.

Why is the range so wide?
Because restorations differ in exactly the ways that cost money. An open roof with dry insulation, few curbs and an acrylic finish sits toward the low end; a roof crowded with rooftop units, with wet areas to cut out, a granulated cap sheet and a silicone finish sits toward the high end. Access and region move it too. A survey of the roof is what lets a contractor narrow the range to a price.
Does a silicone coating cost more than acrylic?
As a rule, yes: silicone systems sit toward the high end of the restoration range and acrylic systems toward the low end. Drainage usually makes the choice rather than budget: where water stands after rain, a silicone system takes the acrylic system's place, going on with no base coat, or on some roofs a solvent-based base and finish coat pair, because under prolonged ponding an acrylic film can lose adhesion and peel. Silicone resists standing water but does not fix drainage.
How do I get a firm price for my roof?
From the roof itself. Have the roof surveyed for wet insulation and any suspect areas confirmed with cores, choose the system, count the curbs, penetrations and seam lengths, then have a roofing contractor price the installed job on that survey. We price the materials for the same roof, and if you have no contractor yet we can introduce you to an installer anywhere in the US.
Is the moisture scan included in these prices?
No. The ranges cover the installed restoration or replacement only. We quote the scan for your roof when you ask; it depends on the roof's size and where the building is.
What do the materials alone cost?
They are priced per project, not listed. Send the roof area, the substrate, the detail counts and the site ZIP through the quote form, and we reply within one business day with the price, freight to the site and a ship date. The installed ranges on this page already include the materials, so if you buy them yourself, agree that with the contractor and nothing is counted twice.
Does a roof in Florida cost more to restore or replace?
For replacement, yes: Florida's wind code keeps replacement in the upper half of its range, and where the existing insulation sits entirely above the deck, a replacement must also meet the current energy code's above-deck insulation requirements. What the code asks of a particular roof, and which permits the work needs, is for the local building department to say; nothing here is code advice.
What happens when the added years run out?
The roof is assessed again then. Coating makers publish recoat specifications, so a coated roof that is still sound and dry can take another coating system; one that is not is replaced at that point, and the restoration has carried the roof through the years in between. Either way the call is made on a survey of the roof at the time.

See a sample scan

Guides

Read before you set a budget

Where the ranges come from, and what moves a roof inside them.

All guides

Find out whether anything is wet, then price it

Send the building's address and we will quote the scan for that roof, anywhere in the US: the map, video from the flight and a written assessment. If a survey has already mapped the roof, send the roof area, the substrate and the site ZIP and we price the materials.